
Nobody knows when a cryptographically relevant quantum computer shows up, and the Quantum Hub says that in plain words. That changes how you plan. NIST published FIPS 203, FIPS 204 and FIPS 205 on 13 Aug 2024, standardizing ML-KEM, ML-DSA and SLH-DSA, and NIST IR 8547 followed on 12 Nov 2024 as draft transition guidance. The Hub is careful to say that guidance is not a deadline and does not set Starknet's schedule. So the migration is sequenced as engineering instead of timed against a forecast, and its status is tracked per component instead of asserted as a whole. Early migration is a project you can schedule. Late migration turns into a coordination problem. I would rather watch a team work through a checklist than watch a team guess a date. The checklist lives here: https://t.co/bqBqknSRIO Which makes @Starknet's position easy to state. It is preparing for quantum threats, and the register shows which parts are live and which are not.
